Lot by North Engineering Building to close June 10

June 7, 2019 | UToday
By Staff



As construction on the North Engineering Building ramps up, lot 19S located on the north of the structure will close Monday, June 10.

In preparation for the first phase of the lab and classroom renovation of the North Engineering Building, the contractor will assemble scaffolding along the north face of the edifice.

“In order to provide space for the equipment and materials necessary for the construction, the north parking lot 19S will be closed,” Christopher Levicki, project manager with Facilities and Construction, said. “There will be a single one-way lane flowing west to east located along the most northern end of the lot for access to the east portion of the lot and emergency vehicle access around the building. That lane will take up the parking spaces in the area.”

Lot 19S is scheduled to remain closed until phase one of the construction project is finished in May next year.

Click to access the login or register cheese